The Court of Appeal has provided important clarification on the scope of the leaseholder protections for cladding remediation under the Building Safety Act 2022 (‘BSA’). In Almacantar Centre Point Nominee No 1 Ltd and another v De Valk and others [2026] EWCA Civ 1466, the Court confirmed that paragraph 8 of Schedule 8 is not limited to defects falling within the statutory definition of a “relevant defect”, and that “unsafe” cladding is not confined to cladding presenting a fire risk.
The case concerned Centre Point House in London, part of the Centre Point development constructed in the 1960s. Its unusual framing system for the façade had been inherently defective since construction, with water ingress causing deterioration and rot. This affected the ability of the timber members to support parts of the façade safely, and one opening window panel had already detached and fallen.
The landlords proposed substantial remediation works, including the removal of much of the existing façade system and the installation of a new steel-framed curtain wall system. The total cost was expected to exceed £12 million.
The landlords applied to the First Tier Tribunal (‘FTT’) under section 27A(3) of the Landlord and Tenant Act 1985 for a determination as to whether the cost of the proposed works could be recovered from the leaseholders through the service charge. The FTT found that the works fell within the landlords’ repairing obligations and were, in principle, recoverable. However, it held that leaseholders with qualifying leases were protected by paragraph 8 of Schedule 8 to the BSA, which provides that “no service charge is payable under a qualifying lease in respect of cladding remediation”. The Upper Tribunal upheld that decision, leading to the landlords’ appeal to the Court of Appeal.
The Court of Appeal Judgment
The landlords appealed on five grounds, all of which were dismissed.
A key issue was whether paragraph 8 only applies where the cladding problem amounts to a “relevant defect” under section 120 BSA. This was significant because a relevant defect must arise in connection with relevant works carried out within the 30-year ‘relevant period’ ending on 28 June 2022, whereas Centre Point House was constructed in the 1960s.
The Court held that paragraph 8 is not restricted to relevant defects. While paragraphs 2 to 7 and 9 of Schedule 8 expressly refer to “relevant defects”, paragraph 8 does not. As the Court stated, “crucially, paragraph 8 is not stated to apply only in relation to ‘relevant defects’”. This contrast supported the conclusion that Parliament did not intend the paragraph 8 protection to be subject to the same restriction.
The Court also rejected the argument that “unsafe” cladding must present a fire risk. It held that “unsafe” should be given its ordinary meaning of “involving danger”. Although fire safety was central to the background to the BSA, the legislation is not concerned exclusively with fire risks. The protection can therefore extend to cladding that is unsafe for other reasons, as demonstrated by the structural safety concerns in this case.
The remaining grounds concerned whether the façade comprised a “cladding system”, whether the works involved its “removal or replacement”, and whether that system formed the outer wall of an external wall system. The Court held that the application of these ordinary words to the particular construction of Centre Point House was essentially a factual matter for the specialist FTT. There was no basis for overturning its conclusions.
Importantly, the Court expressly left open whether a cladding system that constitutes the whole of an external wall system can fall within paragraph 8(2). The Court reserved the issue for a future case.
Key Takeaways
- Paragraph 8 is wider than the “relevant defect” regime. The protection from service charges for cladding remediation is not confined to defects falling within the 30-year relevant period under section 120. This means paragraph 8 may protect qualifying leaseholders in older buildings where the defect itself falls outside that period
- “Unsafe” is not limited to fire safety. Paragraph 8 can apply where cladding presents other forms of danger, including structural safety concerns. This is an important clarification given the BSA’s origins following the Grenfell Tower fire.
- The decision has potentially significant consequences for service charge recovery. Freeholders and landlords proposing façade works will need to consider whether the works involve the removal or replacement of any part of an unsafe cladding system forming the outer wall of an external wall system. Where paragraph 8 applies, no service charge is payable under a qualifying lease in respect of that cladding remediation.
- An important question remains open. The Court did not decide whether a cladding system that constitutes the whole of an external wall system can fall within paragraph 8(2). It expressly reserved that issue for a future case, noting that it “may be of real importance and considerable value”.
For more information, please contact Hannah Keane.